|

1. Base Unit w/ 1/2 HP TEFC 1phase motor
2. Mechanical Flow Meter
3. Inline Heater (For use with vegetable oils)
4. Solenoid Class II G
5. Spray Lance Assembly w/nozzles for spout or belt
6. Outlet Pressure Gauge
7. Internal Heater (1 or 3 phase)
8. On/Off/Auto Switches (standard)
9. Totalizing Meter (optional)
|